|
The following information must be sent to the editor for
project news to be considered for Design News, Building News,
Infrastructure News:
1. Cost of project
2. Start and completion dates
3. Name of Project
4. Type of project
5. Square footage of project.
6. Number of stories.
7. Two to three paragraph description
of project details
8. Location of project
9. Square footage of Site (if
a general building project)
10. Type of foundation, frame,
exterior finishes, roof
11. Unique or unusual things
about project and/or one or two project challenges and solutions.
12. Development team members:
(must include full company name, city, town and role in project),
including architect (or design engineer if an infrastructure
project); interior designer (if different from architect);
structural engineer; site and/or civil engineer); mep engineer(s);
general contractor and/or construction manager; owner and/or
developer.
13. Contact for more information
14. Mail the above information
with a progress photo of project under construction or a photo
of a rendering to: Tom Stabile, Editor, New York Construction
News, 2 Penn Plaza, 9th Floor, New York, N.Y. 10121.
For Newswatch Items: call
the editor at 212-904-4535 or email him at: jack_buehrer@mcgraw-hill.com.
Include re: Newswatch in your subject line.
For Association News after
an event, send a write up of the event and a photograph to
the editor at the above address.
Company News: send a press
release or brief announcement or write up to the editor at
the above address.
For Industry Events: Mail
a photo with an accurate caption (include name of person,
company or affiliation and title for everyone in the picture,
where event took place and what is happening in the picture)
to the editor at the above address.
|